Project Description

PayPal Park

PayPal Park is the stadium for the San Jose Earthquakes soccer team and the largest SPS stadium installation in the U.S.

Schuff Steel detailed, fabricated, and erected the structural steel stadium and roof. In lieu of the usual precast seating treads, Schuff Steel provided the composite steel SPS (Sandwich Plate System) including paint and sealing of joints.

Extensive connection value engineering was used to modify welded connections to field bolted connections limiting touch-up of exposed steel. Less field touch-up of connections allowed for schedule savings.

  • PayPal Park
  • PayPal Park
  • PayPal Park
  • PayPal Park
  • PayPal Park
  • PayPal Park
  • PayPal Park

Project Details

Project Owner:

San Jose Earthquakes

Contractor:

Devcon Construction

Structural Engineer:

Magnusson Klemencic Associates

Architect:

HOK

Steel Tonnage:

4,000 tons

Location:

San Jose, California

Schuff Services: project management, erection engineering, BIM services, steel detailing, steel fabrication, steel erection

Project Overview

Let’s talk about
your next project

    PayPal Park

    • PayPal Park
    • PayPal Park
    • PayPal Park
    • PayPal Park
    • PayPal Park
    • PayPal Park
    • PayPal Park

    Project Details

    Project Owner:

    San Jose Earthquakes

    Contractor:

    Devcon Construction

    Architect:

    HOK

    Steel Tonnage:

    4,000 tons

    Location:

    San Jose, California

    Schuff Services: project management, erection engineering, BIM services, steel detailing, steel fabrication, steel erection

    PayPal Park is the stadium for the San Jose Earthquakes soccer team and the largest SPS stadium installation in the U.S.

    Schuff Steel detailed, fabricated, and erected the structural steel stadium and roof. In lieu of the usual precast seating treads, Schuff Steel provided the composite steel SPS (Sandwich Plate System) including paint and sealing of joints.

    Extensive connection value engineering was used to modify welded connections to field bolted connections limiting touch-up of exposed steel. Less field touch-up of connections allowed for schedule savings.