Westfield UTC Phase III

The Westfield UTC Phase III expansion adds 50,000 square feet of luxury retail and dining space to San Diego’s premier outdoor shopping destination. The project includes two buildings featuring nine new storefronts and two restaurants, along with upgraded landscaping, public art, and a second valet area.

Project Details

Structural Engineer:

Englekirk (acquired by WSP)

Architect:

AO Architecture

Steel Tonnage:

330 tons

Location:

San Diego, CA

Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection

Project Overview

Designed to seamlessly integrate with the existing promenade and enhance guest experience, this new wing is part of a multi-phase transformation that has repositioned Westfield UTC as a high-end, resort-style commercial hub.

Schuff Steel supplied, fabricated, and erected 330 tons of structural steel for the Phase III expansion. Working within an active mall environment required careful coordination to avoid disruption to ongoing operations and to ensure safety for workers and the public. Schuff Steel’s scope supported key architectural elements and was completed on schedule.

Construction began in April 2024, with the new addition scheduled to open to the public in May 2026.

Let’s talk about
your next project

    Westfield UTC Phase III

    Project Details

    Structural Engineer:

    Englekirk (acquired by WSP)

    Architect:

    AO Architecture

    Steel Tonnage:

    330 tons

    Location:

    San Diego, CA

    Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection

    The Westfield UTC Phase III expansion adds 50,000 square feet of luxury retail and dining space to San Diego’s premier outdoor shopping destination. The project includes two buildings featuring nine new storefronts and two restaurants, along with upgraded landscaping, public art, and a second valet area. Designed to seamlessly integrate with the existing promenade and enhance guest experience, this new wing is part of a multi-phase transformation that has repositioned Westfield UTC as a high-end, resort-style commercial hub.

    Schuff Steel supplied, fabricated, and erected 330 tons of structural steel for the Phase III expansion. Working within an active mall environment required careful coordination to avoid disruption to ongoing operations and to ensure safety for workers and the public. Schuff Steel’s scope supported key architectural elements and was completed on schedule.

    Construction began in April 2024, with the new addition scheduled to open to the public in May 2026.