Project Description

  • Stanford BIOE University

Project Details

Project Owner:

Stanford University

Contractor:

Whiting-Turner

Steel Tonnage:

2,250 tons

Location:

Palo Alto, California

Schuff Services:

preconstruction structural engineering BIM services project management steel detailing steel fabrication steel erection

Project Overview

The Bio Engineering and Chemical Engineering Building on the Stanford campus was a 5-story build designed to seamlessly join the new construction with the existing building.

The project was completed within a congested building site with strict price and customer preferences. The build totaled approximately $6 million using 2,000 tons of structural steel and was BRB braced for seismic activity with one story below ground and four above.