Project Description

  • Intel D1X Mod 3

Project Details

Project Owner:

Confidential

Contractor:

Hoffman Construction

Structural Engineer:

Jacobs

Architect:

Confidential

Steel Tonnage:

4,700 tons

Location:

Hillsboro, Oregon

Schuff Services:

preconstructiondesign assist structural engineering BIM services project management steel detailing steel fabrication steel erection

Project Overview

Schuff Steel was contracted to furnish and erect structural and miscellaneous steel relating to the central utility building & parking facility to support the scheduled start of power for the manufacturing facility expansion.

We delivered a complete structural and miscellaneous package from structural steel down to grating and site bollards. The full scope of work included a 3-level steel structure, interior utility support hangers, exterior pipe trestle, precast erection, stair and miscellaneous supply and erection.

The needs of the project required a partner with vast capacity, resources, and skill to adapt and pivot to the fast pace and progression of needs. Our scope grew with the addition of 500 tons of utility support hangers and trestle work designed during the initial phase of structural fabrication and erection.

To accommodate the original project durations Schuff planned and incorporated installation concurrent with structural framing erection. Working alongside other trades and site constraints, Schuff was successful in planning and sequencing the work ensuring client delivery needs were achieved throughout the evolving progression of design and scope.