Executing complex structural steel erection with the first ever “superlift”
State Farm Stadium is considered an architectural icon for the region. With exceptional design of the retractable roof, it was the perfect opportunity for Schuff Steel to perform the first ever “superlift”. Innovative steel fabrication systems and procedures were designed to accommodate the large-scale assemblies and erect as much of the roof structure as possible at one time.
Download our case study to learn how we used innovation to overcome these steel fabrication challenges:
- Working within a tight schedule
- Designing around fabricated materials
- Fabricating for complex designs
- Preparing our team
The State Farm Stadium project illustrates how planning, coordination and execution are integral to the success of a steel fabrication project to ensure accuracy and efficiency.