Edwards Lifesciences Campus Expansion – Phase 1 (Buildings A, B, C)
Phase 1 of the Edwards Lifesciences campus expansion added more than 326,000 square feet of interconnected facilities, including a two-story entry pavilion and museum (Building A), a three-story lab and office building known as the Dream Big Center (Building B), and a two-story dining and conference facility (Building C).
Project Details
Project Owner:
Contractor:
Structural Engineer:
Architect:
Steel Tonnage:
3,200 tons
Location:
Irvine, CA
Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection
Project Overview
All buildings are linked by elevated pedestrian bridges and surrounded by outdoor collaboration spaces designed to promote wellness and innovation.
Schuff Steel fabricated and erected 3,200 tons of structural steel for this phase, incorporating Bolted SidePlate Moment Frames and BRB’s to provide robust seismic performance and design flexibility. Working within a tight and active corporate campus, our team overcame logistical challenges such as limited laydown space and proximity to an operational manufacturing facility. Precise coordination with DPR Construction and other trade partners was essential to maintaining the project schedule and minimizing disruption to ongoing campus operations.
This expansion achieved ambitious sustainability goals:
- Building A was designed to be Net Zero Energy and achieved LEED Platinum certification
- Building B achieved LEED Gold certification, including 33,000 sq. ft. of research labs
- Extensive rooftop photovoltaic systems and outdoor circulation strategies reduce energy usage across the new facilities
Through precise planning and seamless coordination with the project team, Schuff Steel helped deliver a high-performance, LEED-certified campus expansion that meets the client’s ambitious operational and sustainability goals.
Let’s talk about
your next project
Edwards Lifesciences Campus Expansion – Phase 1 (Buildings A, B, C)
Project Details
Project Owner:
Contractor:
Structural Engineer:
Architect:
Steel Tonnage:
3,200 tons
Location:
Irvine, CA
Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection
Phase 1 of the Edwards Lifesciences campus expansion added more than 326,000 square feet of interconnected facilities, including a two-story entry pavilion and museum (Building A), a three-story lab and office building known as the Dream Big Center (Building B), and a two-story dining and conference facility (Building C). All buildings are linked by elevated pedestrian bridges and surrounded by outdoor collaboration spaces designed to promote wellness and innovation.
Schuff Steel fabricated and erected 3,200 tons of structural steel for this phase, incorporating Bolted SidePlate Moment Frames and BRB’s to provide robust seismic performance and design flexibility. Working within a tight and active corporate campus, our team overcame logistical challenges such as limited laydown space and proximity to an operational manufacturing facility. Precise coordination with DPR Construction and other trade partners was essential to maintaining the project schedule and minimizing disruption to ongoing campus operations.
This expansion achieved ambitious sustainability goals:
- Building A was designed to be Net Zero Energy and achieved LEED Platinum certification
- Building B achieved LEED Gold certification, including 33,000 sq. ft. of research labs
- Extensive rooftop photovoltaic systems and outdoor circulation strategies reduce energy usage across the new facilities
Through precise planning and seamless coordination with the project team, Schuff Steel helped deliver a high-performance, LEED-certified campus expansion that meets the client’s ambitious operational and sustainability goals.