Project Description

Stanford BIOE University

The Bio Engineering and Chemical Engineering Building on the Stanford campus was a 5-story build designed to seamlessly join the new construction with the existing building.

The project was completed within a congested building site with strict price and customer preferences. The build totaled approximately $6 million using 2,000 tons of structural steel and was BRB braced for seismic activity with one story below ground and four above.

  • Stanford BIOE University

Project Details

Project Owner:

Stanford University

Contractor:

Whiting-Turner

Steel Tonnage:

2,250 tons

Location:

Palo Alto, California

Schuff Services: preconstruction, structural engineering, BIM services, project management, steel detailing, steel fabrication, steel erection

Let’s talk about
your next project

    Stanford BIOE University

    • Stanford BIOE University

    Project Details

    Project Owner:

    Stanford University

    Contractor:

    Whiting-Turner

    Steel Tonnage:

    2,250 tons

    Location:

    Palo Alto, California

    Schuff Services: preconstruction, structural engineering, BIM services, project management, steel detailing, steel fabrication, steel erection

    The Bio Engineering and Chemical Engineering Building on the Stanford campus was a 5-story build designed to seamlessly join the new construction with the existing building.

    The project was completed within a congested building site with strict price and customer preferences. The build totaled approximately $6 million using 2,000 tons of structural steel and was BRB braced for seismic activity with one story below ground and four above.

    Let’s talk about
    your next project