Project Description

Chandler Regional Medical Center

In a 176,000 square foot expansion, the Chandler Regional Medical Center project included a five-story tower to increase patient capacity and improve hospital facilities.

The addition provided space for a new emergency department, intensive care unit, chapel, patient rooms and food service facilities.

Efficient project delivery methods and design-build strategies were utilized throughout the $74-million dollar project incorporating a great deal of collaboration. BIM modeling ensured the project aligned with the owner’s original design and identified issues early on.

As a result, the Chandler Regional Medical Center was completed 105 days ahead of schedule and $4 million dollars under budget.

Project Details

Project Owner:

Dignity Health

Contractor:

Kitchell

Structural Engineer:

Paragon Structural Engineering

Architect:

Orcutt | Winslow

Steel Tonnage:

1,450 tons

Location:

Chandler, Arizona

Schuff Services: preconstruction, design assist, structural engineering, BIM services, project management, steel detailing, steel fabrication, steel erection

Let’s talk about
your next project

    Chandler Regional Medical Center

    Project Details

    Project Owner:

    Dignity Health

    Contractor:

    Kitchell

    Architect:

    Orcutt | Winslow

    Steel Tonnage:

    1,450 tons

    Location:

    Chandler, Arizona

    Schuff Services: preconstruction, design assist, structural engineering, BIM services, project management, steel detailing, steel fabrication, steel erection

    In a 176,000 square foot expansion, the Chandler Regional Medical Center project included a five-story tower to increase patient capacity and improve hospital facilities.

    The addition provided space for a new emergency department, intensive care unit, chapel, patient rooms and food service facilities.

    Efficient project delivery methods and design-build strategies were utilized throughout the $74-million dollar project incorporating a great deal of collaboration. BIM modeling ensured the project aligned with the owner’s original design and identified issues early on.

    As a result, the Chandler Regional Medical Center was completed 105 days ahead of schedule and $4 million dollars under budget.