Project Description

Aria Convention Center

With the completion of a $154 million dollar expansion project, the Aria convention center offers more than 500,000 square feet of technologically advanced, flexible meeting space. Divided amongst four stories, features include indoor open-air space and a glass-enclosed venue with views of The Park and Las Vegas Arena.

The expansion required building connections between new steel and existing steel within a tight space, making worksite safety a challenge for the Schuff Steel team. Steel erection of 12 large trusses needed to be scheduled for delivery in a “just in time” environment while accommodating a limited entrance and exit way space making it essential for efficient off-loading and erection. The project was completed in 2018, and was built to LEED Gold standards.

  • Aria Convention Center
  • Aria Convention Center
  • Aria Convention Center
  • Aria Convention Center
  • Aria Convention Center
  • Aria Convention Center

Project Details

Project Owner:

Aria Resort & Casino Holdings, LLC

Structural Engineer:

Culp & Tanner

Steel Tonnage:

2,600 tons

Location:

Las Vegas, Nevada

Schuff Services: preconstruction, structural engineering, BIM services, project management, steel detailing, steel fabrication, steel erection

Let’s talk about
your next project

    Aria Convention Center

    • Aria Convention Center
    • Aria Convention Center
    • Aria Convention Center
    • Aria Convention Center
    • Aria Convention Center
    • Aria Convention Center

    Project Details

    Project Owner:

    Aria Resort & Casino Holdings, LLC

    Steel Tonnage:

    2,600 tons

    Location:

    Las Vegas, Nevada

    Schuff Services: preconstruction, structural engineering, BIM services, project management, steel detailing, steel fabrication, steel erection

    With the completion of a $154 million dollar expansion project, the Aria convention center offers more than 500,000 square feet of technologically advanced, flexible meeting space. Divided amongst four stories, features include indoor open-air space and a glass-enclosed venue with views of The Park and Las Vegas Arena.

    The expansion required building connections between new steel and existing steel within a tight space, making worksite safety a challenge for the Schuff Steel team. Steel erection of 12 large trusses needed to be scheduled for delivery in a “just in time” environment while accommodating a limited entrance and exit way space making it essential for efficient off-loading and erection. The project was completed in 2018, and was built to LEED Gold standards.

    Let’s talk about
    your next project